Dongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack Fabrication

Product Details
Customization: Available
Standard: GB, ASTM, DIN, JIS
Tolerance: ±0.01~1.0mm
Still deciding? Get samples of US$ 100/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Years of Export Experience
The export experience of the supplier is more than 10 years
Patents Awarded
The supplier had awarded 1 patents, you can check the Audit Report for more information
to see all verified strength labels (26)
  • Dongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack Fabrication
  • Dongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack Fabrication
  • Dongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack Fabrication
  • Dongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack Fabrication
  • Dongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack Fabrication
  • Dongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack Fabrication
Find Similar Products
  • Overview
  • Product Description
  • Our Advantages
  • Packaging & Shipping
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
24091910
Machining Method
Laser Cutting Bending Welding Grinding etc
Material
Carbon Steel Alloy Steel Stainless Steel
Application
Steel Workshop, Steel Structure Platform, Steel Fa
After-Sales Service
1 Year
Carbon Structural Steel
Q235
Transport Package
Standard Package/Pallet or Container/as Per Custom
Specification
Customized
Trademark
Custom logo
Origin
China
Production Capacity
5000tons/Year

Product Description

Product Description


Dongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack Fabrication
Dongguan factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack Fabrication
Dongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack Fabrication
Description OEM Steel metal fabrication products mild steel fabrication
Material Carbon Steel, Stainless Steel, Alloy Steel, Aluminum Alloy.
Drawing format 3D/CAD/DWG/STEP/PDF
Metal Processing Laser cutting & cutting,laser welding & welding,milling , drilling, stamping, turning-lathe,CNC center and so on.
Certification ISO9001:2015
Machining precision ±0.01~1.0mm
Surface treatment Powder coating,Zinc plating, chrome-plating, polishing, spraying, dust collection,painting and so on
Production application Metal parts, Mechanical parts, Marine Hardware, Electric power fitting, Construction parts, Pipe Fitting, Hardware, Auto parts, Valve parts, Industrial parts, Agricultural machinery, Hinges, etc
Mode of transport: Express /Air Freight Priority/Sea Freight/As Customer Requirements
Service To chart to sample production; OEM / ODM
Packing details Standard package/Pallet or Container/As per customized specifications
MOQ Small order is accepted

Our Advantages

 


Dongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack Fabrication
Dongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack FabricationDongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack Fabrication
Dongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack Fabrication

Packaging & Shipping

 
Select package type
packed in cartons inside, and wooden case outside.
1. Cases packed in wooden cases
2. Paper packaging
3. Foam packing.
Packing according to product packaging or customer requirements.

Transportation
6-36 working days after confirming the order.
The specific delivery time depends on the items and the quantity of your order.
1. Less than 50 kg, you could choose express, such as DHL, UPS, FedEx, TNT,and EMS.(door to door,so convenient)
2. From 50 kg to 200 kg, you could choose to send by air.( fast and safe, but expensive)
3. More than 200 kg, you may consider to send by sea. (but long transit shipping time)
4. We can also deliver as client's requirements
5. We will choose the cheapest and safest way to ship the goods to you.

Receipt of goods time
Air transport 1-7 days.
Sea transport:2-60 day.
International Express: 1-10 days.
Land transportation:5-28 days.
Dongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack Fabrication
 

Company Profile

 

Dongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack FabricationDongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack FabricationDongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack FabricationDongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack FabricationDongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack FabricationDongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack FabricationDongguan Factory Heavy Duty Metal Frame Metal Battery Cabinet Server Rack Fabrication

 

FAQ

 

1. Q:How quickly can you quote?
   A:Within 24 hrs if we have detailed drawings and requirements.
 
2. Q:What information do you need for quoting?
   A: Please provide the 2D/3D drawings (PDF/DWG/DXF/IGS/STP/SLDPRT/etc) and advise material, finish, and quantity.

 
3. Q:What's the MoQ for parts?
   A:Mainly subject to your parts or projects, we are willing to make prototypes for you as a small quantity test run.
 
4. Q:What's the normal production lead time?
   A:For initial samples, within 10-15 days. 30 days for mass production; but If mold is required, please add 20-40 days.
 
5. Q:What about the after-sales service?
   A:Please feel free to contact us for any quality issues, we will take responsibility for any products with quality issues at our expense, meanwhile, we will track down and record the issues to avoid them for the future.
 
6. Q:What are your payment terms?
   A:30% down payment before production by T/T; 70% balance to be paid upon production completion.
 
7. Q:Will my drawings or samples be safe after they are sent to you?
   A:Yes, we are willing to sign an NDA with you if required, your drawings and samples will be kept well and maintained confidential.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier