Automated Welding Equipment for Efficient Stainless Steel Fabrication

Product Details
Customization: Available
Standard: GB, JIS Code, GB, ASTM, DIN, JIS
Tolerance: ±0.01~1.0mm
Still deciding? Get samples of US$ 100/Piece
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Years of Export Experience
The export experience of the supplier is more than 10 years
Patents Awarded
The supplier had awarded 1 patents, you can check the Audit Report for more information
to see all verified strength labels (26)
  • Automated Welding Equipment for Efficient Stainless Steel Fabrication
  • Automated Welding Equipment for Efficient Stainless Steel Fabrication
  • Automated Welding Equipment for Efficient Stainless Steel Fabrication
  • Automated Welding Equipment for Efficient Stainless Steel Fabrication
  • Automated Welding Equipment for Efficient Stainless Steel Fabrication
  • Automated Welding Equipment for Efficient Stainless Steel Fabrication
Find Similar Products
  • Overview
  • Product Description
  • Our Advantages
  • Packaging & Shipping
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
CW-0001-0009
Surface Treatment
Powder Coating Zinc Plating Chrome-Plating Polis
Machining Method
Laser Cutting Bending Welding Grinding etc
Material
Carbon Steel Alloy Steel Stainless Steel
Application
Steel Workshop, Steel Structure Platform, Steel Fa
After-Sales Service
1 Year
Carbon Structural Steel
Q235
Transport Package
Standard Package/Pallet or Container/as Per Custom
Specification
Customized
Trademark
Custom logo
Origin
China
Production Capacity
5000tons/Year

Product Description

Product Description


Automated Welding Equipment for Efficient Stainless Steel Fabrication
Experience the exceptional precision of our Customed Welding Frame, meticulously designed with Laser Cutting and Fabrication Metal Rack. We offer bespoke Welding OEM/ODM services, crafted to impeccably align with your unique specifications.
Automated Welding Equipment for Efficient Stainless Steel Fabrication
Description OEM Steel metal fabrication products mild steel fabrication
Material Carbon Steel, Stainless Steel, Alloy Steel, Aluminum Alloy.
Drawing format 3D/CAD/DWG/STEP/PDF
Metal Processing Laser cutting & cutting,laser welding & welding,milling , drilling, stamping, turning-lathe,CNC center and so on.
Certification ISO9001:2015
Machining precision ±0.01~1.0mm
Surface treatment Powder coating,Zinc plating, chrome-plating, polishing, spraying, dust collection,painting and so on
Production application Metal parts, Mechanical parts, Marine Hardware, Electric power fitting, Construction parts, Pipe Fitting, Hardware, Auto parts, Valve parts, Industrial parts, Agricultural machinery, Hinges, etc
Mode of transport: Express /Air Freight Priority/Sea Freight/As Customer Requirements
Service To chart to sample production; OEM / ODM
Packing details Standard package/Pallet or Container/As per customized specifications
MOQ Small order is accepted

Our Advantages

 


Automated Welding Equipment for Efficient Stainless Steel Fabrication
Automated Welding Equipment for Efficient Stainless Steel FabricationAutomated Welding Equipment for Efficient Stainless Steel Fabrication
Automated Welding Equipment for Efficient Stainless Steel Fabrication

Packaging & Shipping

 
Select package type
Our products are intelligently encased within cartons and reinforced with a robust wooden shell on the outside for enhanced protection.
1. Each case is meticulously packed in sturdy wooden cases, ensuring maximum protection.
2. Our durable paper packaging offers reliable protection for moderately sensitive products.
3. Delicate items receive our specialized soft foam packing, safeguarding their integrity.
We provide adaptable packaging solutions that align perfectly with product specifications or tailor to customer needs.

Transportation
Anticipate delivery to be efficiently completed within 6-36 working days following order confirmation.
Please be aware that exact delivery times are contingent upon item specifics and order volume.
1. For shipments under 50 kg, choose express services like DHL, UPS, FedEx, TNT, and EMS for seamless door-to-door delivery.
2. For shipments ranging from 50 kg to 200 kg, air freight offers swift and secure delivery, albeit at a premium.
3. With loads over 200 kg, sea transport is the most viable choice, optimal for large shipments despite extended transit durations.
4. Our delivery solutions are adaptable to meet the specific demands of our clients.
5. Our dedicated team ensures your goods are transported via the safest and most economical route available.

Receipt of goods time
Air transport promises delivery within a rapid 1-7 days.
Sea transport time varies from 2-60 days, dependent on the shipping route.
International Express services strive to fulfill deliveries in a swift 1-10 days.
Land transportation typically spans 5-28 days, subject to travel distance.
Automated Welding Equipment for Efficient Stainless Steel Fabrication
 

Company Profile

 

Automated Welding Equipment for Efficient Stainless Steel FabricationAutomated Welding Equipment for Efficient Stainless Steel FabricationAutomated Welding Equipment for Efficient Stainless Steel FabricationAutomated Welding Equipment for Efficient Stainless Steel FabricationAutomated Welding Equipment for Efficient Stainless Steel FabricationAutomated Welding Equipment for Efficient Stainless Steel FabricationAutomated Welding Equipment for Efficient Stainless Steel Fabrication

FAQ

 

1. Q:How quickly can you quote?
A:Within 24 hrs if we have detailed drawings and requirements.

2. Q:What information do you need for quoting?
A: Please provide the 2D/3D drawings (PDF/DWG/DXF/IGS/STP/SLDPRT/etc) and advise material, finish, and quantity.


3. Q:What's the MoQ for parts?
A:Mainly subject to your parts or projects, we are willing to make prototypes for you as a small quantity test run.

4. Q:What's the normal production lead time?
A:For initial samples, within 10-15 days. 30 days for mass production; but If mold is required, please add 20-40 days.

5. Q:What about the after-sales service?
A:Please feel free to contact us for any quality issues, we will take responsibility for any products with quality issues at our expense, meanwhile, we will track down and record the issues to avoid them for the future.

6. Q:What are your payment terms?
A:30% down payment before production by T/T; 70% balance to be paid upon production completion.

7. Q:Will my drawings or samples be safe after they are sent to you?
A:Yes, we are willing to sign an NDA with you if required, your drawings and samples will be kept well and maintained confidential.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier